tresor

Projects in Ontario and Quebec, Canada and the Ashanti region of Ghana, West Africa

TRS.V Stock Quote

TRS.V0.10  chart-0.01
2010-03-11 15:56

Agudee Gold Processing Plant with Photos Dec 2009

It’s been one week now that the Agudee Gold Processing plant has moved to running in two shifts. Most of the startup pains are behind us and Tres-Or moves forward with optimizing the operation. The pictures illustrate an operational mechanical process to extract gold from the gold bearing gravels.

Considerable credit has to go to Bruce Luckman for conceptualizing the design, the Oasis Engineering team that specified and directed its fabrication and the local Ghanaian staff who have provided stellar work ethic throughout the construction phase. Tres-Or with it’s very junior market cap is primed to move into the next tier.

The operation will break for the holidays from December 22 to January 6th. I anticipate to put up at least one more post before Christmas. Tres-Or wishes everyone a wonderful holiday season. Please make sure to follow us on Twitter @TresOrResources and on the TSX Venture Exchange, symbol TRS.

Tagged as: , , , ,

Leave a Response